MAIN ACCESS
MODE SELECT

Offline

 

Author: Darren L. Hensley

Date Published: 15 Jun 2008 18:00

Title of the Article:

Book, Periodical, Web Page title, Volume, Page, Paragraph: H-10-K Enterprises Virtual Museum

Date Referenced, URL: http://www.h-10-k.com

Name
  Logo
Elbos    
  CAPTAINS LOG BUILDERS DATA
                      SERVICE RECORD CONTINUUM
   
 

ENGINEERING
CARGO BAY
VIEW SCREEN
DATABASE
TRANSPORTER ROOM
STELLAR CARTOGRAPHY
TURBO LIFT MAP
 
GALACTIC REFERNECE
 
 
 
1ST CONTACT
02 Jul 2008 20:03

09.0.0

   

Wednesday, July 02, 2008 20:03

Captains Log

     
The Fate of the Pabilli Original Story, Revision 3(Final)    
     
     

Stardate 572050.4 Established the voice recording system for the log

Stardate 572630.4  pre-departure entry

Stardate 572662.52Post landing status report

Stardate 572085.4 Progress report Primary systems

Stardate 572631.09 The christening

Stardate 572663.4 1st day survival and damage inventory

Stardate 572162.4 Progress report Secondary systems

Stardate 572632.4 Departure from the solar system

Stardate 572664.5Post incident status report Day 2 Enterprise D Saucer section

Stardate 572200.4 progress report temporal database

Stardate 572634.4 Full impulse power trials

Stardate 572665.4 Post incident status report Day 3Salvage Plan survival gear

Stardate 572247.4 progress report warp nacelles

Stardate 572634.94 Warp core and emergency power trials

Stardate 572666.24Post incident status report Day 4Refit plan

Stardate 572285.4 progress report temporal drive

Stardate 572640.4 Warp speed trials

Stardate 572667.04 Post incident status report Day 5

Stardate 572329.4 progress report temporal transporters

Stardate 572640.84 Engineering adjustments and fine-tuning

Stardate 572668.04 Post incident status report Day 6

Stardate 572368.4 progress report internal power

Stardate 572641.4 Warp speed trials warped five

Stardate 572669.04 Post incident status report Day 7

Stardate 572414.4 progress report crew selection

Stardate 572642.4 Warp speed trials warp 9.9

Stardate 572670.04 Post incident status report Day 8

Stardate 572453.4 progress report crew status

Stardate 572643.4 Temporal navigation trials

Season 1 Episode 1

Stardate 572496.4 progress report chief engineer’s log

Stardate 572644.4 Conventional navigation trials

Season 1 Episode 2

Stardate 572535.4 progress report replicator status

Stardate 572646.4 Deflector control issues

Season 1 Episode 3

Stardate 572581.4 progress report impulse drive

Stardate 572646.4 Deflector control corrected

Season 1 Episode 4

Stardate 572587.4 progress report call completion

Stardate 572648.4 Return to sector one

Season 1 Episode 5

Stardate 572598.4 progress report TCARS installation

Stardate 572651.4 Earth orbit

Season 1 Episode 6

Stardate 572603.4 progress report update temporal database

Stardate 572656.4 Mission status

Season 1 Episode 7

Stardate 572614.4 progress report projected commission date

Stardate 572658.4 Earth orbit departure destination point of origin

Season 1 Episode 8

Stardate 572525.4 progress report pre-departure preparations

Stardate 572662.4 Mission status meeting with Q.

Season 1 Episode 9

Stardate 572628.4 progress report ship status active

Stardate 572662.5 Crew mission brief and departure

Season 1 Episode 10

Stardate 572630.4 Captain’s log pre-departure entry

Stardate 572662.51 Emergency computer log entry

Season 1 Episode 11

 

This site and all it’s contents are copy protected. Copy Write by Darren Hensley and H-10-K Enterprises© 1997-2050 Unauthorized use is punishable by law. The H-10-K Logo(and it’s variations) is a registered trade mark of Darren Hensley and H-10-K Enterprises